heavy load cargo barge – Sema Marine | Deck Barge & Tug https://sema-marine.com/en Deck Barge & Tug Wed, 10 Mar 2021 09:51:16 +0000 en-US hourly 1 https://wordpress.org/?v=5.7 https://sema-marine.com/en/wp-content/uploads/2020/07/cropped-Sema-Logo-e1375688442669-1-32x32.png heavy load cargo barge – Sema Marine | Deck Barge & Tug https://sema-marine.com/en 32 32 Izmit Osmangazi Bridge Project https://sema-marine.com/en/izmit-project/ Thu, 16 Jul 2020 23:00:59 +0000 https://sema-marine.com/en/?p=1771

Izmit Osmangazi Bridge Project

NOMAYG JV formed by five Turkish companies (Nurol, Özaltın, Makyol, Yüksel and Gocay), and one Italian construction company Astaldi was awarded by the construction project.

Osmangazi Bridge has a total length of 2907m and 1.550 m long main span, the bridge is the 4th longest suspension bridge on the world.  The height of the Osmangazi Bridge is about 234 meters. The bridge is located between Dilovasi and Hersek.

Sema-1 was chartered by IHI at the Izmit Bay Bridge Project which is called Osmangazi Koprusu, one of the biggest suspension bridges in the World. Deck Cargo Barge Sema-1 completed all tasks smoothly.

Please feel free to contact us to get a quotation for the deck cargo barge charter should you require at your projects.

Quick Details of the Sema-1

Loading Capacity

: 2000 tons

Deck Strength

: 40 tons/2 at crane paths, 10tons/m2 overall

Dimensions

: 61m Length, 16m Width, 4m Depth

Build Year

: 2013

]]>
Hamitabat Project – Transportation of Transformers https://sema-marine.com/en/hamitabat-transformers/ Wed, 15 Jul 2020 23:07:02 +0000 https://sema-marine.com/en/?p=1722

Hamitabat Project – Transportation of Transformers

1200 MW capacity, supplies electric for 1.271.749 people, Hamitabat Natural Gas Combined Cycle Power Plant is located at the Luleburgaz district of the Kırklareli City. The completion date of this heavy move project is the end of June 2016. We as Sema Marine completed our services in April 2016.

Our, Flat Top Deck Barge, equipment SEMA-1 was chartered by Hareket Proje Tasimaciligi, which is the main contractor for heavy move project of the segments of the power plant, for transportation of Hamitabat power plant transformers between Tuzla and Marmara Ereglisi. All stability, ballast operations, loading, and unloading calculations and operations completed successfully for 2 unit transformers, 450tons each. Deck Barge SEMA-1 is capable of performing similar projects

Please feel free to contact us to get a quotation for such heavy cargo transportation by deck cargo barge.

]]>