Archive by Author

Hamitabat Project – Transportation of Transformers

Our equipment SEMA-1 was chartered by Hareket Proje Tasimaciligi for transportation of Hamitabat power plant transformers. All stability, loading and unloading calculations and operations completed successfully.  

Comments Off on Hamitabat Project – Transportation of Transformers Continue Reading →

1915 Canakkale Bridge

Sema-1 was hired by Unitek Insaat , which is subcontractor of bridge contractor consortium DLSY (Daelim – Limak – SK E&C – Yapi Merkezi), for piling works of towers foundations.  

Comments Off on 1915 Canakkale Bridge Continue Reading →

Izmit Project

Sema-1 was hired by IHI at the Izmit Bay Bridge Project which is called Osmangazi Koprusu.  

Comments Off on Izmit Project Continue Reading →

Barge Building

Length : 61,50 m Breadth : 16,00 m Depth : 4,00 m Draught : 2,50 m Type : Flattop Barge with Crane Tracks Class : BV Deck strength : 15tons/m2 under crane tracks , 10 tons/m2 overall Loading capacity : 2000 tons Light Ship  : 570 tons Deck Equipments : Anchor Windlass 220m 34mm Anchor Chain at Starboard Side 165m 34mm Anchor […]

Comments Off on Barge Building Continue Reading →

Tug Boat Building

Length O.A : 30.5 meters Beam Moulded : 11 meters Depth Moulded : 5 meters Draft Designed : 4.10 meters Service Speed : 12 knots Bollard Pull : 60 tons Class : BV or ABS Total Power : 3400~3700kW Propulsion : 2 x ASD Thrusters Diesel Gens. : 2 x 86kW Nav. / Comm. : […]

Comments Off on Tug Boat Building Continue Reading →